Cunningham 1:16 rigging

Estimated reading time: < 1 min

 

[one_third_last]

2x 25mm wire high-load block Harken
[/one_third_last]


1. Install the two 25mm wire blocks on the loops at both sides of the mainsail.
2. Feed the white line of the cunningham system through the wire block and fixate it in the cam cleat mounted on the mast. Secure it with a figure 8 knot.

 

Applicable to boats:
Was this article helpful?
Dislike 1

Continue reading

Next: Batten tensioning
Scroll to Top